Indonesia’s building rules under Government Regulation No. 16 of 2021 work in two stages. Before construction, a project needs a PBG (Persetujuan Bangunan Gedung, building approval). Before the building can be used, it needs an SLF (Sertifikat Laik Fungsi, certificate of fitness for function). Applications go through the government’s SIMBG system.
Both stages involve MEP. The PBG technical review covers mechanical, electrical and plumbing plans alongside architecture and structure. The SLF follows an inspection that checks what was actually built against what was approved — and in Bali, practitioners report that it is now enforced rather than waved through.
What the MEP side usually needs
- As-built drawings that show the systems as installed, not as first designed.
- Equipment schedules with make, model and capacity for the main plant.
- Testing and commissioning records — fire alarm and sprinkler tests, fire pump performance, generator load tests, earthing resistance measurements, water quality results.
- Electrical installation certification. Electrical installations in Indonesia also require a certificate of operational fitness (Sertifikat Laik Operasi, SLO) from an accredited inspection body.
- Equipment-specific inspections for items such as lifts and pressure vessels, which carry their own occupational safety certification.
Illustrative photo: an inspection walk-through during a building renovation. Photo by the U.S. Army Corps of Engineers Europe District via Wikimedia Commons, public domain.
Renovations count too
Many operating hotels are renovated in phases over years. Each phase changes the systems that the original approval described. Consultants in Bali report that SLFs for commercial buildings are renewed by re-inspection after a set period, so an existing hotel will meet this process again — and an out-of-date set of drawings becomes a problem at exactly the wrong moment.
Why we hand over current drawings
It is one of the things we promise every client: as-builts are updated at handover, not promised and forgotten. When the next inspection arrives, or the next renovation starts, the shaft layout, the risers and the single-line diagram are on file and correct.
Requirements differ between regencies and change over time, so owners should confirm the current list with the local building office. What does not change is that a well-documented installation makes the process far shorter.