ABOUT US
WHO WE ARE
THE SHORT VERSION
Two Decades On Bali Hotel Sites
PT. Bali Cukup Mandiri has installed mechanical, electrical, plumbing and HVAC systems since 2002. The ledger runs to 231 recorded projects, 72% of them hotels and villas, with 41 live on site today.
We work as a subcontractor to main contractors and directly for hotel owners. That means most of what we build is never seen again once the ceiling closes — which is exactly why the record matters more than the photographs.
Accredited with AKLI, ATAKI and GAPEKSINDO. Around 300 contract staff, coordinated from our own office in Renon, Denpasar.
Projects recorded, 2002–2026
On site right now
Hotels and villas
Our Goals
Vision & Mission
Where we intend to take the company, and the five commitments that get us there on every project.
Vision
To establish PT. Bali Cukup Mandiri as the leading national provider in the MEP and HVAC contractor industry, with projects spanning across Indonesia.
- Mechanical
- Electrical
- Plumbing
- HVAC
Mission
-
Quality at a fair price
Delivering the highest standards of service quality at competitive prices.
-
Open communication
Ensuring effective and transparent communication with clients and stakeholders to achieve maximum satisfaction.
-
Continuous improvement
Committing to continuous improvement in all operational and managerial aspects to achieve excellence.
-
Current knowledge & technology
Keeping up with the latest knowledge and technology to provide products and services that align with market developments.
-
Planned, measured work
Implementing well-planned and measured work methods to optimize efficiency in every project phase.
RETURNING CLIENTS
The Whole Ledger
Every account below has hired us more than once. Each mark is a year they came back. This is the same chart as on the homepage, shown in full.
Computed from the project ledger, 2002–2026. Only accounts identifiable by project name appear here — private villa owners and developer clients cannot be grouped from a project title, so the true repeat rate is higher than the chart shows.
What Doesn't Change
After Handover
We answer the phone
A system we installed in 2009 is still a system we installed. Defects-period or not, the call gets picked up.
The drawings stay current
As-builts are updated at handover, not promised and forgotten. When you renovate in eight years, the shaft layout is on file.
The same supervisors come back
Crew continuity is why a twelfth Westin project runs faster than a first one. Institutional memory is a deliverable.